{"id":813,"date":"2025-11-10T17:30:00","date_gmt":"2025-11-10T17:30:00","guid":{"rendered":"http:\/\/proalnet.com\/?p=311"},"modified":"2026-10-30T17:31:01","modified_gmt":"2026-10-30T17:31:01","slug":"27-como-calcular-el-oee-overall-equipment-efficiency-o-eficiencia-general-de-los-equipos","status":"publish","type":"post","link":"https:\/\/controldepiso.com\/en\/27-como-calcular-el-oee-overall-equipment-efficiency-o-eficiencia-general-de-los-equipos\/","title":{"rendered":"STEPS TO CALCULATE OEE (Overall Equipment Efficiency)."},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"813\" class=\"elementor elementor-813\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-249425cf e-flex e-con-boxed e-con e-parent\" data-id=\"249425cf\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-34e67fd7 elementor-widget elementor-widget-text-editor\" data-id=\"34e67fd7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The OEE measurement system is a highly sophisticated approach to the analysis of production losses, which allows the user to identify the true causes of such losses.<\/p>\n<p>The success of modern manufacturing methodologies, such as Lean Manufacturing or TPM (Total Productive Maintenance), depends to a large extent on the accurate measurement and analysis of production data.<\/p>\n<p>OEE measures all the fundamental parameters in industrial production, which are shown below:<\/p>\n<h4><span style=\"color: #252839;\"><strong>DISPONIBILIDAD<\/strong><\/span><\/h4>\n<p>It measures equipment losses due to scheduled or unscheduled shutdowns, this depends on each company, it is recommended to include both.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-2096 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-1024x397.png\" alt=\"\" width=\"800\" height=\"310\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-1024x397.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-300x116.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-768x298.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-1536x596.png 1536w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre-18x7.png 18w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-produccion-industrial-alegre.png 2014w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<h4><span style=\"color: #252839;\"><strong>RENDIMIENTO<\/strong><\/span><\/h4>\n<p>It measures the losses caused by equipment malfunction while producing units, small stops, or micro-stops, as well as those caused by not operating at the required speed or the performance determined by the manufacturer.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-2097 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-1024x512.png\" alt=\"\" width=\"800\" height=\"400\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-1024x512.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-300x150.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-768x384.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-1536x768.png 1536w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado-18x9.png 18w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Falla-en-la-linea-de-embotellado.png 1774w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<h4><span style=\"color: #252839;\"><strong>CALIDAD<\/strong><\/span><\/h4>\n<p style=\"text-align: left;\">It is the percentage of the total production that is produced without defects.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-2098 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-1024x397.png\" alt=\"\" width=\"800\" height=\"310\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-1024x397.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-300x116.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-768x298.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-1536x596.png 1536w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente-18x7.png 18w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Linea-de-reciclaje-industrial-eficiente.png 2014w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<table style=\"border: none;\">\n<tbody style=\"border: none;\">\n<tr style=\"border: none;\">\n<td style=\"width: 15%; border: none;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2101 size-medium\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_-300x283.png\" alt=\"\" width=\"300\" height=\"283\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_-300x283.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_-1024x968.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_-768x726.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_-13x12.png 13w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bfPor-que-medir-el-OEE_.png 1290w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/td>\n<td style=\"border: none;\">\n<ol style=\"text-align: left;\">\n<li>Companies make large investments in machinery and need to obtain the maximum return on their investment in the shortest possible time.<\/li>\n<li>It is essential to reduce our productive losses and make our company more competitive.<\/li>\n<li>What is measured can be managed and improved.<\/li>\n<li>It allows all company employees to work with reliable information.<\/li>\n<li>It allows for immediate improvement actions at any level.<\/li>\n<li>It evidences problems of unavailability, low efficiency, and non-quality.<\/li>\n<\/ol>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"border: none;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2102\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_-300x283.png\" alt=\"\" width=\"300\" height=\"283\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_-300x283.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_-1024x968.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_-768x726.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_-13x12.png 13w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/2.-\u00bfComo-se-calcula-el-OEE_.png 1290w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/td>\n<td style=\"text-align: left; border: none;\">\n<p>OEE is calculated on different occasions in different ways. In some cases, only unscheduled stops are subtracted, while in other cases, different formulas are used but the result is the same. Here we show a simple way to do it. You can check it with your formulas and evaluate the results.\n\nOEE = Availability x Performance x Quality\n\nAvailability = (Available time \u2013 unproductive time or stops) \/ available time. \n\n*This formula sometimes considers available time without taking into account scheduled stops. It is recommended to use the total hours of the shift and the total stops since scheduled stops are subject to improvement.<\/p>\n<p>Performance = Actual units \/ (Effective time or stop-free time x Standard speed)  \n\n*This can vary to Speed \/ Standard Speed. The result will be the same.<br \/>Quality = (Total units \u2013 non-conforming product units) \/ Total units.  \n\n*In this indicator, the mistake is sometimes made of considering wasted raw material, such as cuttings or leftovers, as defective units. It should only take into account finished units and raw material waste.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"border: none;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2103\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE-300x283.png\" alt=\"\" width=\"300\" height=\"283\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE-300x283.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE-1024x968.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE-768x726.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE-13x12.png 13w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Ejemplo-de-calculo-del-OEE.png 1290w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/td>\n<td style=\"text-align: left; border: none;\">Let\u2019s calculate, as an example, the real OEE of a production line during an 8-hour shift with a production capacity of 1,000 pieces\/hour. As an example, we will consider that the line produces pieces for only 6 hours (availability of 75%), manufactures an average of 700 pieces\/hour (performance of 70%), and at the end of the shift has produced 168 defective pieces (quality of 96%):<br \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2099 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-1024x445.png\" alt=\"\" width=\"800\" height=\"348\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-1024x445.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-300x130.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-768x334.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-1536x668.png 1536w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70-18x8.png 18w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/cdec6208-9497-4e34-85e4-bec0a80fcf70.png 1902w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><br \/>An OEE of 50% indicates that it is necessary to analyze and implement improvement actions regarding non-productive times and the<br \/>operation at the required machine speed.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: none;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2104 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE-1024x968.png\" alt=\"\" width=\"800\" height=\"756\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE-1024x968.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE-300x283.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE-768x726.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE-13x12.png 13w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/\u00bf_-Como-Mejorar-con-OEE.png 1290w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/td>\n<td style=\"text-align: left; border: none;\">\n<p>An OEE value of 100% is practically unattainable, but it will help us work systematically towards continuous improvement.<br \/>OEE also allows us to compare machines, production cells, production lines,<br \/>work shifts, production plants, and even compare ourselves<br \/>with the best in our industrial sector.<br \/>OEE can be classified according to the level of excellence, generally as follows:<\/p>\n<ul>\n<li>0% &lt; OEE &lt; 65% = Unacceptable. Very low competitiveness.<\/li>\n<li>65% &lt; OEE &lt; 75% = Fair. Low competitiveness. Acceptable only if you are in the process of improvement.<\/li>\n<li>75% &lt; OEE &lt; 85% = Acceptable. Continue the improvement to advance towards the World Class.<\/li>\n<li>85% &lt; OEE &lt; 95% = Good competitiveness. Enter World Class Values.<\/li>\n<li>95% &lt; OEE &lt; 100% = Excellent competitiveness. World Class values.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2100 size-medium aligncenter\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja-209x300.png\" alt=\"\" width=\"209\" height=\"300\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja-209x300.png 209w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja-714x1024.png 714w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja-768x1102.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja-8x12.png 8w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Trabajador-Estrella-con-Casco-Naranja.png 1047w\" sizes=\"(max-width: 209px) 100vw, 209px\" \/><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"border: none;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2105 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real-1024x968.png\" alt=\"\" width=\"800\" height=\"756\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real-1024x968.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real-300x283.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real-768x726.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real-13x12.png 13w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/Como-medir-el-OEE-en-tiempo-real.png 1290w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/td>\n<td style=\"text-align: left; border: none;\">Measuring OEE in real-time has an incalculable value, as it allows problems to be addressed instantly, rather than three days later or even 30 days later when nothing can be done about what has already happened. Production plants are a constantly changing world on a daily basis, and having real-time information and alerts is essential in today's world to address productivity drops in real-time.\n\nPROALNET offers a platform for real-time OEE calculation. It is a company that provides technological solutions for the optimization and improvement of industrial production processes. Currently, it offers its solutions through the GESPLINE platform \u2013 Online Production Management \u2013 and its specialized consulting services.\n\nThe GESPLINE platform is an M.E.S. (Manufacturing Execution System) that captures real-time information from machines in production plants. It provides reliable, timely, structured, and statistical information on time losses due to stoppages (Availability Indicator), downtime, speed losses (Performance Indicator), and losses due to non-conforming product quality (Quality Indicator), as well as the causes that provoke them and how to relate them to production losses. All of this is done automatically and through sensors.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a href=\"https:\/\/controldepiso.com\/en\/productos\/\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1608 size-large\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-1024x183.png\" alt=\"\" width=\"800\" height=\"143\" srcset=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-1024x183.png 1024w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-300x53.png 300w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-768x137.png 768w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-1536x274.png 1536w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-2048x365.png 2048w, https:\/\/controldepiso.com\/wp-content\/uploads\/2026\/10\/link-productos-18x3.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a><\/p>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p><strong><span style=\"color: #daa520;\"><span style=\"font-size: 20px;\"><span style=\"color: #252839;\">If you want to receive articles like this by email, sign up!<\/span> <span style=\"color: #19d76e;\"><a style=\"color: #19d76e;\" href=\"https:\/\/controldepiso.com\/en\/blog-subscription\/\" target=\"_blank\" rel=\"noopener\">Click Here.<\/a> <\/span><\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #daa520;\"><strong><span style=\"font-size: 20px;\"><span style=\"color: #252839;\">Lo invitamos a ver nuestros casos de \u00e9xito:<\/span> <span style=\"color: #19d76e;\"><a style=\"color: #19d76e;\" href=\"https:\/\/controldepiso.com\/en\/casos-de-exito\/\" target=\"_blank\" rel=\"noopener\">Click Here!<\/a><\/span><\/span><\/strong><\/span><\/p>\n<p><span style=\"color: #daa520;\"><strong><span style=\"font-size: 20px;\"><span style=\"color: #252839;\">Lo invitamos a ver el video de c\u00f3mo funciona nuestra plataforma OPTTIME:\u00a0<span style=\"color: #19d76e;\"><a style=\"color: #19d76e;\" href=\"https:\/\/youtu.be\/Rk4L8lCbZVk\" target=\"_blank\" rel=\"noopener\">Click Here!<\/a><\/span><\/span><\/span><\/strong><\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>El sistema de medici\u00f3n OEE, es un enfoque altamente sofisticado para el an\u00e1lisis de las p\u00e9rdidas productivas, que permite al usuario identificar las verdaderas causas de dichas p\u00e9rdidas. El \u00e9xito de las metodolog\u00edas de fabricaci\u00f3n moderna, tales como Lean Manufacturing \u00f3 TPM (Total Productive Maintenance), depende en gran medida de la medici\u00f3n precisa y el [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1343,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"page_builder":"","footnotes":""},"categories":[11],"tags":[],"class_list":["post-813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts\/813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/comments?post=813"}],"version-history":[{"count":7,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts\/813\/revisions"}],"predecessor-version":[{"id":2169,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts\/813\/revisions\/2169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/media\/1343"}],"wp:attachment":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/media?parent=813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/categories?post=813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/tags?post=813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}