{"id":826,"date":"2016-07-08T10:16:46","date_gmt":"2016-07-08T15:16:46","guid":{"rendered":"http:\/\/proalnet.com\/?p=614"},"modified":"2016-07-08T10:16:46","modified_gmt":"2016-07-08T15:16:46","slug":"34-el-ciclo-de-mejora-continua-pdca-phva","status":"publish","type":"post","link":"https:\/\/controldepiso.com\/en\/34-el-ciclo-de-mejora-continua-pdca-phva\/","title":{"rendered":"The Continuous Improvement Cycle (PDCA)"},"content":{"rendered":"<p>The PDCA Cycle is also known as \"Deming's Circle\", as it was Dr. Williams Edwards Deming who was one of the first to use this logical scheme in quality improvement and gave it a strong boost.<\/p>\n<p>Based on a concept devised by Walter A. Shewhart, the PDCA Cycle is a four-step continuous quality improvement strategy, also called a continuous improvement spiral and is widely used by the various systems used in organizations to manage aspects such as quality (ISO 9000), environment (ISO 14000), occupational health and safety (OHSAS 18000), or food safety (ISO 22000).<\/p>\n<p>The acronym PDCA is the acronym for Plan, Do, Check, Act, and Act.<\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" style=\"width: 623px; height: 401px;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen1-1.jpg\" alt=\"\" \/><\/p>\n<p>The interpretation of this cycle is very simple: when you seek to obtain something, the first thing to do is to plan how to achieve it, then proceed to carry out the planned actions (do), then check how it has been done (verify) and finally implement the relevant changes so as not to make the same mistakes again (act). The cycle begins again by planning its execution but introducing the improvements from the previous experience.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" style=\"width: 623px; height: 480px;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen2.jpg\" alt=\"\" \/><\/p>\n<p style=\"text-align: center; color: #008080;\"><strong><br \/>\nHow can it be achieved?<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" style=\"text-align: center;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen3-2.jpg\" alt=\"Planear: Determinaci\u00f3n de los objetivos deseados. Que hacer para alcanzarlos adecuadamente\" \/><\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" style=\"text-align: center;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen4-1.jpg\" alt=\"Hacer: Determinar las responsabilidades para la ejecuci\u00f3n de lo planeado. Definir y proveer los recursos necesarios para el cumplimiento del plan. Desarrollar las acciones definidas en el plan. Documentar y registrar las acciones desarrolladas\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" style=\"text-align: center;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen5-1.jpg\" alt=\"Verificar: Establecer mecanismos de seguimiento y verificaci\u00f3n. Establecer indicadores y modelo de evaluaci\u00f3n. Efectuar seguimiento del cumplimiento de lo planeado. Documentar y registrar los resultados obtenidos \" \/><\/p>\n<p style=\"text-align: center;\">With the Gespline platform, it captures real-time information from machines in production plants, provides reliable, timely, structured and statistical information on units produced, time losses due to stoppages, downtime, speed losses and losses due to non-conforming product quality, as well as the causes that cause them and how to relate them to production losses. All automatically in order to be able to follow up and make decisions in a timely manner and in real time.\"<\/p>\n<p style=\"text-align: center;\"><a style=\"text-align: center;\" href=\"https:\/\/www.youtube.com\/watch?v=OWXelPZCOgY\" target=\"_blank\" rel=\"noopener\"><br \/>\n<iframe title=\"GESPLINE- Como funciona? Mide eficiencia (OEE) de planta autom\u00e1ticamente\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/OWXelPZCOgY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><br \/>\n<\/a><\/p>\n<p><img decoding=\"async\" class=\"aligncenter\" style=\"text-align: center;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen6.jpg\" alt=\"Actuar: ante las desviaciones observadas. establecer acciones correctivas. Definir posibilidades de mejora. Documentar y registrar\" \/><\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/12\/Imagen-de-WhatsApp-2024-12-06-a-las-14.12.34_cc02f9a3.jpg\" alt=\"\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/proalnet.com\/como-funciona\/\"><strong><img decoding=\"async\" class=\"aligncenter\" style=\"width: 568px; height: 211px;\" src=\"https:\/\/controldepiso.com\/wp-content\/uploads\/2024\/11\/aboutUs.png\" alt=\"\" \/><\/strong><\/a><\/p>\n<p style=\"text-align: center;\"><strong><span style=\"color: #daa520;\"><span style=\"font-size: 20px;\">If you want to receive articles like this by email, sign up!\u00a0 <a href=\"https:\/\/proalnet.com\/inscripcion-blog\/\" target=\"_blank\" rel=\"noopener\">Click Here.<\/a> <\/span><\/span><\/strong><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #daa520;\"><strong><span style=\"font-size: 20px;\">We invite you to watch the video on how our GESPLINE platform works:\u00a0 <a href=\"http:\/\/proalnet.com\/como-funciona\/\" target=\"_blank\" rel=\"noopener\">Click Here!<\/a><\/span><\/strong><\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>El Ciclo PDCA tambi\u00e9n es conocido como \u00abC\u00edrculo de Deming\u00bb, ya que fue el Dr. Williams Edwards Deming uno de los primeros que utiliz\u00f3 este esquema l\u00f3gico en la mejora de la calidad y le dio un fuerte impulso. Basado en un concepto ideado por Walter A. Shewhart, el Ciclo PDCA constituye una estrategia de [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[28],"_links":{"self":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts\/826"}],"collection":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/comments?post=826"}],"version-history":[{"count":0,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/posts\/826\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/media\/1347"}],"wp:attachment":[{"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/media?parent=826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/categories?post=826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/controldepiso.com\/en\/wp-json\/wp\/v2\/tags?post=826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}